PROJECT DESCRIPTION

As part of a personnel loan contract for a consultant, TEKNEMA was responsible for supervising the installation of a new oil-free compressor system and advising the customer on how to reduce compressed air downtime for the plant.
During the project, TEKNEMA discovered a major deficiency in the epoxy paint inside a tank. The compressed air tanks were installed in parallel with the old one to minimize downtime, resulting in only 1 hour of downtime. The existing compressor was relocated and put back into service. When the new compressor was commissioned, no downtime was required to allow both systems to operate simultaneously. In this way, the customer can use his old compressor during maintenance or technical problems.

SERVICES PROVIDED BY TEKNEMA

PRE-CONSTRUCTION PHASE

  • Development of construction budget and schedule
  • Execution plan evaluation
  • Turnkey budgeting services
  • Logistical organization and decision support

CONSTRUCTION MANAGEMENT

  • Budget and construction schedule management
  • Subcontractor management
  • Quality control of materials and workmanship
  • Supervision and coordination of work from start-up to commissioning

MISE EN SERVICE

  • Compliance of installations
  • Documentary verification
  • Coordination with supplier for training of operating and maintenance personnel

SANTÉ ET SÉCURITÉ
The TEKNEMA team ensured that measures to safeguard the Health and Safety of personnel and facilities were put in place during the project.

Loan staff
Expert consultant contract for this new compressor system installation project.

TEKNEMA, expert en gérance de construction et solution clé en main, est spécialisé dans les secteurs pharmaceutique, agroalimentaire et bioindustriel.

Intégration et infographie: FOLO